OK, as of 1:22 PM, the turf guys aren't even in sight. My handy-dandy camera, however, is and I've got a few new pics of the INTERIOR of the Ops Center. Bear in mind, they just started framing up walls in the last two days and no lighting has been installed yet so you'll probably have to use your imagination a little bit here.
Exterior shots:

This is the view of the building from the field. The brick work is actually complete. The rest of the exterior wall will be white stucco.

This the front exterior (facing the road and David's place). Workers are adding steel framework for a front veranda much like exists on the front of DeMoss.

Random construction worker. This is mostly for Brokeback's benefit. All we need now is a cop and an Indian chief.
Interior shots:
Basement

Here's where you get to use that imagination. This is the weight room / speed training room. This area makes up nearly the entire basement of the facility and I was standing in the southwest corner of the room for this picture. To the left of the support beams will be the weight room and, on the right, the speed training area w/ its own turf .
Ground floor

The training room. Those big boat-looking things are actually enormous tubs that will sit in the floor against the back wall.

The players' lounge.

The locker room. It's actually larger than what you see but I couldn't get back far enough to fit the whole thing into frame. It's roughly the same square-footage size as our current locker room, but it's oriented more centrally as opposed to our current one which is really stretched out.
Second floor

View from the head coach's office window. You know it's the head coach's office because it's the only office w/ its own bathroom attached.

View from the Multi-Purpose Room.
That's it for today. Hopefully, as work progresses I'll be able to get some more shots that make a little more sense.
"I invite all the young champions on Liberty Mountain to come up and rub my woolly mustache."