ALUmnus wrote:News regarding the School of Engineering building. Will break ground this fall, be ready in a couple years. I've heard in the past that it will be built in the bookstore parking lot, but the article says "across from DeMoss Hall".
The artist rendering is a little underwhelming, but maybe that's because the standard has been set so high.
https://www.liberty.edu/index.cfm?PID=18495&mid=312334
Trying to use the bit of DeMoss in the picture and the tower as reference points, and knowing how close the highway is, it sure looks like they are basically building this in the DeMoss parking lot. It must be snuggled up pretty tight. It looks like it basically is laid out diagonally between DeMoss and the new Business building, with the left wing parallel to DeMoss and the right wing lining up at the same angle as the angled end of the Business building.
If that positioning is correct, then It really encroaches on the grand entrance on the "old side" of DeMoss, which seems awkward. But, that probably just means that DeMoss then gets a refresh on that side to bring it up to speed with everything new around it.