- October 15th, 2011, 12:27 pm
#360912
Thoughts -
1. Will the current crossing at the tracks be closed, and the new car tunnel under the tracks connecting to Harvard street be opened in conjunction with the new library opening?
2. As is planned the library will be a stones throw away from the tracks and many times throughout the day will be inundated with whistles from the trains. Obviously the closing of that crossing would fix the problem.
1. Will the current crossing at the tracks be closed, and the new car tunnel under the tracks connecting to Harvard street be opened in conjunction with the new library opening?
2. As is planned the library will be a stones throw away from the tracks and many times throughout the day will be inundated with whistles from the trains. Obviously the closing of that crossing would fix the problem.